ACME Solar Hold. (544283) Feb 2026 Filing Analysis

01 · Management Credibility

Does management do what it says?

ExceededOther Findings
88/100

The company reported a Cash ROE of 20.1% for FY26, significantly higher than the 16% threshold. (1 exceeded, 4 met across 5 tracked commitments)

Net Debt/Run-Rate EBITDA targeted to be under ~5.5x on operational portfolio basis

ACME Solar Hold. · Investor PPT · Feb 2026 · p.20
ExceededCapacity Under Construction and Commissioning Pipeline
76/100

The company exceeded its upgraded target by commissioning 2,352 MWh (~2.35 GWh) of BESS capacity by the end of the financial year. (1 exceeded, 2 met, 1 revised, 1 in progress across 5 tracked commitments)

Cumulatively, with 422 megawatt commissioned year to date, we remain firmly on track to achieve our FY'26 commissioning guidance of 450 megawatt with a balance 28 megawatt at advanced stages of construction.

ACME Solar Hold. · Concall Transcript · Feb 2026 · p.4

See the full cited Management analysis of ACME Solar Hold.

Create free account →
02 · Business Model

How durable is the business?

Capacity Under Construction and Commissioning Pipeline
80/100

The company is rapidly expanding its capacity under construction, with a total portfolio now reaching 7,770 MW, including a significant pivot toward Firm and Dispatchable Renewable Energy (FDRE) and Battery Energy Storage Systems (BESS). (1 expanding)

Operational Capacity: 2,540 MW (Jan'25) to 2,962 MW (Jan'26)

ACME Solar Hold. · Investor PPT · Feb 2026 · p.7
Pumped Storage Hydropower Project Pipeline
75/100

The company is expanding its cost advantage by fast-tracking Battery Energy Storage Systems (BESS) at existing sites, saving approximately Rs. 20 lakhs per MW in transmission infrastructure costs. (1 expanding, 1 new)

By deploying batteries at existing operational sites, we are optimizing the use of available transmission infrastructure, saving transmission CAPEX of about 20 lakhs per megawatt.

ACME Solar Hold. · Concall Transcript · Feb 2026 · p.6

See the full cited Business Model analysis of ACME Solar Hold.

Create free account →
04 · Risk

What could break the thesis?

Pumped Storage Hydropower Project Pipeline

The company is accelerating BESS commissioning (target ~2 GWh by Q4 FY26). While merchant risk exists, management is integrating BESS into Firm and Dispatchable Renewable Energy (FDRE) projects with 25-year PPAs to stabilize cash flows. (1 easing)

Once commissioned, this BESS capacity is proposed to be integrated with respective FDRE projects, which will then continue under the PPA for 25 years

ACME Solar Hold. · Investor PPT · Feb 2026 · p.10

See the full cited Risk analysis of ACME Solar Hold.