AI-generated · cited to primary sources · not investment advice · How we research
Our verdict on Alpex Solar isn’t the consensus take — see where we landed, and the one risk the bull case glosses over.
See the verdict — free →Nine-month FY26 revenue already reached Rs. 1,551 crore, exceeding the full-year Rs. 1,500 crore guidance before Q4. Management further indicated FY26 revenue would be more than Rs. 3,000 crore under its 2x framework. (3 exceeded, 2 in progress across 5 tracked commitments)
“as per that guidance, our revenue should exceed in this year by Rs.3,000 crores, but we are upbeat that with our cell line which is going to be operational in the next 90-days, so our numbers should exceed our guidance by a reasonable. margin.”
FY26 revenue substantially exceeded the Rs. 1,500 crore guidance, reaching Rs. 2,223.27 crore. (1 exceeded, 3 met, 1 revised across 5 tracked commitments)
“Alpex Solar is on track to become a fully integrated solar manufacturer with 3.6 GW of Modules by FY27”
The target has not yet been achieved. Q3 FY26 EBITDA margin was 14.03%, and management only stated that margins should expand rapidly once cell manufacturing starts. The cell line was expected to start around Q1 FY27. (4 in progress across 4 tracked commitments)
“since our cell is almost there, so, for Alpex, we don't see any pressure on the margins in the short or in the long run. So, we will continue enjoying the better margins than the industry.”
Funding for the broader cell project was clarified as a mix of internal accruals and term debt. Of the Rs. 825 crore total project cost, Rs. 425 crore was to come from internal accruals and Rs. 400 crore from debt, materially larger than the previously indicated small-loan framework. (1 revised across 1 tracked commitment)
“This entire project cost for solar cell... is Rs. 825 crores. So, out of Rs. 825 crores we have plan of raising term loan... Rs. 400 crores only and balance Rs. 425 crores is coming from internal accruals resources.”
See the full cited Management analysis of Alpex Solar
Module manufacturing remained the core business, but management described the business as expanding sharply in volume. H1 FY26 business volume was stated to be approximately 270%-300% higher, while module capacity was being expanded by 1.2 GW and another 1.2 GW was planned. Compared with the Aug 2026 baseline, modules remain the primary revenue stream, although competition is creating margin pressure. (5 expanding across 1 engine)
“solar module manufacturing being our primary revenue driver ... Our 2.4 gigawatt and soon to be 3.6 gigawatt module lines”
The broader solar EPC business was an expansion initiative in the Nov 2025 presentation, with planned capacity of 150 MW: 35 MW by FY26 and 115 MW by FY27. The baseline later reports an active 115 MW EPC installation target, indicating that the planned EPC platform remained a growth area. However, the presentation did not provide actual EPC revenue or revenue share separately from solar-pump EPC. (5 expanding)
“EPC - TWO PHASED IMPLEMENTATION TO ACHIEVE 150 MW CAPACITY; First phase - 35 MW by FY26; Second phase - 115 MW by FY27.”
The company's integration moat strengthened materially. In Nov 2025, Alpex was moving from module manufacturing toward cells, aluminium frames, EPC and joint ventures for junction boxes. By Aug 2026, the baseline describes module, planned cell and aluminium-frame operations as an established integration strategy, with the advantage strengthening as facilities are commissioned. (5 expanding across 4 engines)
“we are producing aluminum frame in the facility, and we are likely to expand the capacity to 18,000 tons per annum. ... standalone basis this unit is also contributing towards the profitability of the company.”
The module business was still the core engine in H1 FY26 and grew substantially year over year. Consolidated revenue rose from Rs. 265.12 crore in H1 FY25 to Rs. 903.24 crore in H1 FY26, while EBITDA margin improved from 13.67% to 16.01%. This indicates both strong volume/revenue growth and better operating profitability, although the later baseline notes that the module market is becoming more competitive. (1 expanding, 3 new, 1 shifted across 1 engine)
“the cell business nowadays commands an EBITDA of around 35% to 40% and PAT of 20% to 25%. And there is still ample demand in the market and we don't see these margins going down substantially. And we hope to maintain at least for one year this kind of EBITDA or the PAT margins”
Solar water-pump systems expanded from Rs.118.70 crore in FY25 to Rs.214.53 crore in FY26. This stream remained meaningful but its share of standalone operating revenue fell from 15.2% to 9.7% because module revenue grew much faster. The business has a proven rural base of more than 26,000 installations. (1 shifted, 1 stable)
“Solar Water Pump System & Equipment 21,453.37 11,869.67”
See the full cited Business Model analysis of Alpex Solar
Module capacity is expanding in clear, staged increments: 1.2 GW capacity was established by FY23-25, 2.4 GW is targeted for FY26 and 3.6 GW by FY27. This represents a 3x increase from the 1.2 GW base over roughly two years. The latest planned step-up remains positive and indicates accelerating capacity creation. (5 accelerating across 5 signals, 1 leading indicator)
“So, with respect to the selling potential, we will have almost six months of clear manufacturing time for 2.2 gigawatt. So, that means around 1 gigawatt of cell will be available for selling in the market. And the market has extremely high appetite for the solar cells. ... So, assuming that we do even 65% of that, that means we will be doing around Rs. 1,700 crore in the last, I mean in the H2.”
The presentation does not disclose a 35–40% cell-business EBITDA margin, 20–25% PAT margin, or Q1 FY27 company margins. Instead, it reports consolidated Q1 FY26 EBITDA margin of 17.1% and PAT margin of 11.1%, up from 5.6% and 1.4% in Q1 FY25. The latest reported margins therefore show a sharp improvement, but there is no cell-specific margin series. (2 accelerating, 3 new trend across 5 signals)
“EBITDA Margin (%) Q1FY25 5.6% Q1FY26 17.1%; PAT Margin (%) Q1FY25 1.4% Q1FY26 11.1%”
Management's revenue ambition is accelerating from the current-year base toward a much larger integrated business. The company expects FY26 revenue to exceed Rs. 1,500 crore by a reasonable margin and says the next year's growth could again be approximately 2x, implying a potential FY27 revenue level around Rs. 3,200 crore based on the original Rs. 780 crore base. However, the specific Rs. 4,000 crore full-capacity estimate is not stated in this transcript, so it should be treated as an external prior estimate rather than a newly confirmed data point here. (1 accelerating, 4 new trend across 5 signals)
“Our original guidance was 2x from Rs. 780 crores... 780 times 2 is 1500 to 1600. And then another 2x will be make it 3200. So, we can go up to that. And I can say that we will achieve this kind of growth.”
The Kusum business shows a strong year-on-year expansion plan: revenue increased from Rs. 223 Cr last year to a FY27 target of Rs. 500 Cr, while Rs. 350 Cr of orders are already being executed. The latest order position provides improving visibility, although actual FY27 revenue is not yet reported. (1 accelerating across 1 signal)
“Last year we did Rs. 223 crores and this year we had a target of Rs. 500 crores. We have already received orders of Rs. 350 crores, which we are executing and as soon as these tenders open, we hope to surpass that also.”
See the full cited Future Growth analysis of Alpex Solar
In the older November 2025 period, management said ALMM List 2 was expected to become effective from June 2026 and would require module makers to use locally produced cells. This made the regulatory support important to the company's demand outlook. Compared with the August 2026 baseline, where the implementation was still described as expected only by end-2026, the policy timeline appears to have become less certain or later. Therefore, regulatory dependence has worsened. (5 intensifying, 5 high-severity)
“We spent almost Rs. 890 CR... as of now our total debt is on this is just Rs. 341 odd crores... it won't be more than Rs. 350 odd crores or maybe Rs. 360 odd crores the debt component on this cell line.”
Management projected blended company EBITDA margins above 29%-30% after cell production begins, compared with current module EBITDA margins of about 15%-16%. It also claimed TOPCon could provide roughly 2% higher profit at the PAT level than mono-PERC. These are forward estimates without demonstrated Alpex cell operating results, so the risk was already high. The August 2026 baseline still relied on estimated cell EBITDA margins of 35%-40%, meaning the margin promise remained unproven rather than being de-risked. (2 stable, 2 high-severity)
“The cell business nowadays commands an EBITDA of around 35% to 40% and PAT of 20% to 25%.”
See the full cited Risk analysis of Alpex Solar
AI-generated informational research only. ThesisLoop is not investment advice, a stock recommendation, or a guarantee of returns.